Below are construction photo updates of the Starliner rebuild at Cypress Gardens.
Below are several sets of photos as the roller coaster was being rebuilt.
Enjoy!!!
Construction Update June 3rd, 2007!
What is new today out at Cypress Gardens. I met one of the contractors today and was let in on some more information about the ride. First notice the first two photos below. That is what will become the station house, I had thought it was for a transfer track but it is the station. I was told that the ride will have 9 sets of magnetic brakes and a set of pneumatic brakes. A lot of painting has been done over the last week as alot of the structure is turning white. They were standing the bents for the lift hill today and they hope to have the lift done in the next day or so. Most of the bents should be standing within the next few days. Steel layers for track should start this week. Lift hill chain trough and motors have arrived and should be installed in the next week or so. A lot of track layers have been added this week as about half of the track is in place. Lots of work around the site is happening and to much to list, but the ride is really coming together. Photos below show the station house and lift area, tons of photos of the far end turn around from various points around the park along with the usual photos of the entire job site.
Enjoy!!!