Construction Update June 4th, 2017
Everyday this thing just gets better and better. The trains arrived but are still in the simi.  All the track is connected, all the main structure is up. There are a lot of small pieces of steel through out that need to be added to the structure. The inversion looks amazing as it rolls over the station. It looks more like a Zero G roll then a barrel roll as its pretty elongated. Lots of track work getting finished with most of the steel layers being added through out. Overall the ride is coming together and looks simply amazing.
Mine Blower Construction Updates for June 2017
Thumbnails

Scroll the Thumbnails Left & Right for More Photos

Construction Photos
Final Construction Update June 15th, 2017
Its here the final update, with the rides opening announced its time to take a final look at the roller coaster. Lots still to do but guess they will get it done. Over all the coaster came out great, looks great and cant wait to ride. As for work, lots of last of the deal work is happening with track work steel running boards and other finish work. Word is the coaster should open on Friday June 23rd, 2017 so go take a ride.
Construction Photos

Scroll the Thumbnails Left & Right for More Photos