Construction Update May 6th, 2017
Looking good as Mine Blower work continues at a quick pace. Around the top of the lift they are just about done with the last pieces of bents going up today. Through out the ride there has been lots of wood stack work happening. The first sections of steel top layer are getting started in the brake run area. Lift hill chain trough is in place, some brakes have been added and gates and other mechanical stuff in the station. The ride has the inversion and two turns to be complete. Getting closer everyday!
Mine Blower Construction Updates for May 2017
Thumbnails

Scroll the Thumbnails Left & Right for More Photos

Construction Photos
Construction Update May 21st, 2017
WOW! Mine Blower is really looking amazing. We are getting closer every week as work continues at Fun Spot America. Lift hill has been installed this week as all the bents toward for about 80 percent of the ride have been erected. Lots of new angles in the track that are addons to the original concept. The big show this week is the addition of some of the structure that will have the corkscrew inversion. Its cool to see how the track will flip and the way they designed the element.
Construction Photos

Scroll the Thumbnails Left & Right for More Photos